Services

Concreting services in Rockhampton

Groundworks, formwork and reinforcement, tilt panels and concrete works for builders, project managers and homeowners. Quotes can be labour-only or include supply.

SCOPE 01

Groundworks

Good slabs start with good ground. The crew assesses ground conditions, manages excavation and preps the site, whether it is a shed slab or a full commercial development.

Poor prep leads to cracking, delays and rework. Compaction and levelling are done before any formwork goes in.

  • Detailed excavation and site cuts
  • Subgrade preparation and compaction
  • Levelling and cut-and-fill
  • Slab and footing preparation
Excavated strip footing with steel reinforcement ready to pour

SCOPE 02

Formwork and reinforcement

Formwork that is clean, straight and built to specification, so the concrete holds its shape. Steel is placed and tied to meet the structural drawings.

Covers small residential jobs through to multi-phase commercial sites.

  • Footings, ground slabs and suspended slabs
  • Walls, columns and pits
  • Boxing, bracing, propping and custom formwork
  • Mesh, bar chairs and tied steel cages
  • Concrete pumping
Steel fixer checking starter bars on a slab

SCOPE 03

Tilt panels

Every stage of the tilt-up process: layout, steel fixing, cast-in fittings, bracing, the pour, curing and the lift.

Panels can be fabricated on site to help manage site logistics on commercial and industrial builds.

  • On-site panel fabrication
  • Erection and bracing
  • Lift design analysis
  • Working from your plans and engineer's drawings
Crane lifting a tilt panel with rigging

SCOPE 04

Residential concreting

Slabs, driveways and outdoor areas for homeowners, builders and tradies. Help choosing layout, thickness and finish so it works now and lasts.

Finishes from standard steel trowel and broom through to exposed aggregate and decorative concrete.

  • House slabs, extensions and foundations
  • Shed slabs and footings
  • Driveways, footpaths and patios
  • Pool areas
  • Decorative and exposed aggregate finishes
Long exposed aggregate driveway leading to a shed

SCOPE 05

Commercial concreting

Commercial-grade concrete for builders, developers and project managers: working to program, coordinating with other trades and meeting site access requirements.

Past work includes schools, warehouses, hospitals, resorts, shopping centres and defence projects.

  • Ground and suspended slabs
  • Footings, columns and walls
  • Retaining walls, pits and lift pits
  • Loading docks and hardstands
  • On-site panel fabrication
Large commercial slab pour with a concrete boom pump

Common questions

Before you pour

Short answers to questions the office hears often. Call for advice on your job.

When can I drive on a new driveway?

You can usually walk on it after 24 to 48 hours. Wait at least 7 days before driving on it. Concrete reaches full strength at about 28 days, depending on weather, thickness and mix.

Do I need council approval for a slab at home?

It depends on the slab. Small paths and patios often don't. House slabs, larger sheds and anything tied to drainage, plumbing or electrical usually do. Check with your council or builder first.

How long do groundworks take?

A small residential slab or driveway can take one to two days. Larger commercial jobs with excavation, drainage or many footings can take a week or more. Weather, soil and site access all affect timing.

Can you quote labour only?

Yes. Quotes can be labour-only or include supply of materials.

Pricing a slab, driveway or commercial pour?

Call the Rockhampton office for a quote. Labour-only or supply-and-pour, residential or commercial.

Call (07) 4922 3146Get a quote